Construction & structural works / S02

Plain Concrete & Blinding

Plain-concrete blinding creates a preparatory layer before subsequent structural construction. It helps establish the required base level beneath footings or other specified surfaces; it is not a substitute for designed reinforced-concrete foundations.

No guesswork pricing. The final offer follows a review of your site, materials and scope.

The work, explained

What this service covers

Choose the exact activities your property needs. The final scope is agreed after reviewing the site.

01

Concrete blinding below foundations

Lean-concrete layers under the specified foundation positions.

02

Sub-base preparation

Preparing a practical working base for the next construction stage.

03

Surface leveling

Concrete leveling layers where required by the plan.

Before the first day

What we review before starting

A reliable offer begins with the real conditions of the property—not an unexplained price per square meter.

No guesswork pricing. The final offer follows a review of your site, materials and scope.

Levels and elevations

Finished elevation and intended layer thickness are clarified before work.

Ground preparation

The surface condition beneath the blinding layer is reviewed.

Following works

The blinding sequence is coordinated with subsequent foundation tasks.

Working together

From first call to the agreed scope

01

Tell us what you need

Call and explain the property location, service and intended result.

02

We review the site

Measurements, access, surface condition and materials are clarified.

03

Agree the offer and deadline

Work scope, price, responsibilities and schedule are written down.

04

Execute the agreed work

The service is carried out according to the agreed scope and project requirements.

OUR PRICE PROMISE

Your construction work. An even lower quote.

Bring us a written lower offer for comparable work. We’ll propose a lower price for the same defined scope and agreed materials. We determine the final amount after examining the property and documenting the requirements.

For the same documented scope and material specifications, under mutually agreed written conditions.
MSH BLOCK↓LOWERCOMPARABLE QUOTE
FAQ

Frequently asked questions

Is blinding concrete the same as a structural foundation?+
No. It is typically a preparatory layer; structural foundations are a separate designed element.
Can you include it with reinforced-concrete works?+
Yes, the scope can be discussed alongside reinforced-concrete foundation works.
How do I get a price for this service?+
Call MSH Block and describe the work. The final offer is determined after a review of the actual site, scope and material requirements.
Can you offer less than another contractor?+
Bring a lower written quote for genuinely comparable work. We will offer a lower price under agreed written terms.
How is the work deadline agreed?+
The intended schedule and any remedies for qualifying delays should be defined before work begins in the contract.
MSH BLOCK · ARMENIA

Tell us about your project.

Call MSH Block to discuss the location, work needed and next step. We will define a site-specific offer after reviewing your requirements.

Call now +374 77 674 004The main contact is by phone. No online form, published prices or deposits through this site.
Call now · +374 77 674 004